October Manufacturing ISM Report On Business®; PMI at 50.8%; New Orders, Production and Employment Growing; Supplier Deliveries Slowing; Inventories Contracting

Supplier Deliveries

The delivery performance of suppliers to manufacturing organizations was slower in October as the Supplier Deliveries Index registered 51.3 percent, which is 0.1 percentage point lower than the 51.4 percent registered in September. This is the 29th consecutive month the Supplier Deliveries Index has been above 50 percent. A reading above 50 percent indicates slower deliveries.

The five industries reporting slower supplier deliveries in October are: Furniture & Related Products; Computer & Electronic Products; Transportation Equipment; Miscellaneous Manufacturing; and Food, Beverage & Tobacco Products. The five industries reporting faster deliveries in October are: Plastics & Rubber Products; Primary Metals; Fabricated Metal Products; Chemical Products; and Machinery. Eight industries reported no change in supplier deliveries in October compared to September.

Supplier Deliveries           %Slower         %Same         %Faster         Net         Index
 
Oct 2011 10 81 9 +1 51.3
Sep 2011 12 81 7 +5 51.4
Aug 2011 12 81 7 +5 50.6
Jul 2011 13 80 7 +6 50.4

« Previous Page 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15  Next Page »



Review Article Be the first to review this article
Rand3D

SolidCAM: SolidCAM SEE IT LIVE

Featured Video
Jobs
System Designer/Engineer for Bluewater at Southfield, MI
Director of Process Engineering. for Tekni-Plex at Toledo, OH
Mechanical Engineer for Allen & Shariff Corporation at Pittsburgh, PA
Project Manager for Keystone Aerial Surveys at Philadelphia, PA
GIS Specialist for Fresno Irrigation District at Fresno, CA
Division Engineer for Montana Dept. Of Commerce at Helena, MT
Upcoming Events
Manufacturing in America 2018 at Ford Field 1902 St. Antoine, Detroit MI - Mar 14 - 15, 2018
ACE 2018 Conference at The Westin Indianapolis 241 W Washington St Indianapolis IN - Mar 20 - 22, 2018
ESPRIT World 2018 at Indianapolis Marriott Downtown 350 West Maryland Street Indianapolis IN - Jun 11 - 15, 2018
HxGN LIVE 2018 at The Venetian Las Vegas NV - Jun 12 - 15, 2018
Kenesto: 30 day trial
Tebis
MasterCAM



Internet Business Systems © 2018 Internet Business Systems, Inc.
25 North 14th Steet, Suite 710, San Jose, CA 95112
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise