CMPRO is the First PLM Tool to Get a Five Star Rating for CMII Compliance

PANAMA CITY, Fla., Nov. 2, 2010 — (PRNewswire) — CMPRO is the first product lifecycle management (PLM) tool to get a five star rating from the Institute of Configuration Management (ICM) for CMII compliance. CMPRO was assessed on October 10, 2010 and received five stars under the revised rating criteria; which means that CMPRO is the first tool to provide all 144 of the functionality elements for the CMII model.

The revised rating criteria for CMII compliance reflect a configuration management tool's functionality based on 144 elements. The functional elements assessed include: as-planned and as-released baselines, validation and release records, changes and revision records, business program management, and more. According to the ICM's 5-Star Rating System for Enabling Software Tools, "CMII is a business model for achieving integrated process excellence. It provides an infrastructure which enables organizations to accommodate change and keep requirements clear, concise and valid. Without this capability, an organization has no choice but to operate in the corrective action mode and spend a huge ratio of their resources on intervention."  For more information on the CMII standards and the new rating criteria visit the CMII Compliant Tools page on the ICM Website.

About Professional Systems Associates

Professional Systems Associates builds CMPRO, product lifecycle management software designed for the aerospace and defense industries. CMPRO accommodates organizations that need full support of the CMII process model, DoD practices (such as MIL-STD-973), and mainstream industry standards (such as ANSI/EIA-649); and who would benefit from having DoD practices integrated with the CMII process model. For more information on how CMPRO can meet your CMII needs visit the PSA Website.

About the Institute of Configuration Management

The Institute of Configuration Management is one of the worldwide providers of CMII training and certification. CMII expands and realigns the objectives of Configuration Management to: provide an infrastructure to achieve integrated process excellence; accommodate change; keep requirements clear, concise and valid and records and data accurate; and ensure that work products conform to their requirements in each case. The CMII infrastructure is achieved by integrating all configuration management-related elements into one cohesive unit, as needed to accommodate change and keep requirements clear, concise and valid. For more information on the CMII model visit the ICM Website.

Emma Hartsfield

850-303-2568

emma.roach@psasys.com



SOURCE Professional Systems Associates, Inc.

Contact:
Professional Systems Associates, Inc.
Emma Hartsfield
Phone: +1-850-303-2568
Email Contact




Review Article Be the first to review this article
Featured Video
Editorial
Jeff RoweJeff's MCAD Blogging
by Jeff Rowe
GE Additive’s Big Plans For Metal AM
Jobs
ECAD Designer - Data Connectivity for Delphi at Auburn Hills, MI
Mechanical Engineer II - Requisition ID 090445 for L3 Technologies at New York, NY
Estimator / Bidder for Rulon International at Saint Augustine, FL
Upcoming Events
33rd Annual Coordinate Metrology Society Conference at Snowbird UT - Jul 17 - 21, 2017
EMO Hannover 2017 at Hannover Germany - Sep 18 - 23, 2017
The 30th Annual Integrated Process Excellence Symposium & Training at Wyndham Grand Bonnet Creek Resort Orlando FL - Sep 18 - 20, 2017
Additive Manufacturing Conference 2017 at Knoxville Convention Center 701 Henley Street Knoxville TN - Oct 10 - 12, 2017



Internet Business Systems © 2017 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy Advertise