Boeing 787 Flight-Test Program Progressing

EVERETT, Wash., April 20 — (PRNewswire) — The U.S. Federal Aviation Administration (FAA) granted Boeing (NYSE: BA) expanded type inspection authorization (TIA) today, clearing the way for its personnel to fully participate in future test flights and for the collection of required flight-test data. Initial TIA was granted Feb. 11, which supported the collection of flutter certification data.

The expanded TIA marks the FAA's confirmation that the airplane and team are ready to collect additional certification data. Boeing achieved the expansion by demonstrating the readiness of the airplane throughout a variety of speeds, altitudes and configurations.

"This TIA expansion is another significant step toward delivering airplanes to our customers. We remain on track to deliver the first airplane to ANA this year," said Scott Fancher, vice president and general manager of the 787 program, Commercial Airplanes.

In addition to receiving expanded TIA, Boeing finalized the aerodynamic configuration of the 787.

"We have completed sufficient testing to decide that no additional changes to the external lines or shape of the airplane are required," said Fancher. "Having an airplane match its expected performance with so few changes is rare and speaks to the maturity of the design."

The 787 flight-test fleet logged its 500th hour of flying April 16. On Sunday, ZA003, the flight-test airplane outfitted with interior elements, landed in Florida, where it will go through extreme weather testing at McKinley Climatic Laboratory at Eglin Air Force Base.

Boeing released two videos highlighting flutter and ground effects testing. These videos feature commentary by the pilots and the chief project engineer and are available on www.boeing.com and www.newairplane.com.  

Contact:

Lori Gunter

787 Communications

+1 206-931-5919

SOURCE Boeing

Contact:
Boeing
787 Communications, Lori Gunter of Boeing
Phone: +1-206-931-5919
Web: http://www.boeing.com




Review Article Be the first to review this article
Autodesk - DelCAM

Editorial
Jeff RoweJeff's MCAD Blogging
by Jeff Rowe
Hexagon’s Recent Ups & Downs Update
Jobs
Solidworks Product Designer for NASCENT Technology at Charlotte, NC
Developer-Support-Implementation Engineer for EDA Careers at San Francisco Area, CA
SYSTEMS INTEGRATOR for Palm Beach County Human Resources at West Palm Beach, FL
CAD/CAM Regional Account Manager (Pacific Northwest) for Vero Software Inc. at Seattle, WA
Upcoming Events
AI·GI·CRV Conference 2017 at Edmonton, Alberta Canada - May 16 - 19, 2017
Innorobo 2017 at Docks de Paris Paris France - May 16 - 18, 2017
Display Week 2017 at Los Angeles Convention Center 1201 S Figueroa St Los Angeles CA - May 21 - 26, 2017
LiveWorx Tech Conf 2017 at Boston MA - May 22 - 25, 2017
SolidCAM: Patented Wizard to optimal feeds & speeds



Internet Business Systems © 2017 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy Advertise