Boeing Completes Ultimate-Load Wing Test on 787

EVERETT, Wash., March 28 — (PRNewswire) — Boeing (NYSE: BA) today completed the ultimate-load wing up-bending test on the 787 Dreamliner static test unit. During the testing, loads were applied to the airframe to replicate 150 percent of the most extreme forces the airplane is ever expected to experience while in service. The wings were flexed upward by approximately 25 feet (7.6 meters) during the test.

The initial results of the ultimate-load test are positive. More extensive analysis and review are required before the test can be deemed a success.

"The test program has been more robust than any conducted on a Boeing commercial jetliner," said Scott Fancher, vice president and general manager of the 787 program, Boeing Commercial Airplanes. "It has taken countless hours of hard work by the Boeing team and our partners to work through the static test program. Everyone who has been involved in this effort over the past several years should be very proud of their contributions to ensuring the safety of the 787 Dreamliner.

"We are looking forward to the technical team's report on the details of the test results," said Fancher. It will take them several weeks to work through all of the data.

During each second of the more than two-hour test, thousands of data points were collected to monitor the performance of the wing. Key data points are monitored real-time during the test, but all of the data will be evaluated in the weeks ahead.

787 Dreamliner Background

The 787 Dreamliner is an all-new twinjet designed to meet the needs of airlines around the world in providing nonstop service between mid-size cities with new levels of efficiency. The airplane will bring improved levels of comfort to passengers with larger windows, bigger baggage bins and advances in the cabin environment, including lower cabin altitude, higher humidity and cleaner air. Delivery of the first 787 is planned for the fourth quarter of 2010.

Contact:

Lori Gunter

787 Communications

+1 206-931-5919

Photo and caption are available here: http://boeing.mediaroom.com

SOURCE Boeing

Contact:
Boeing
Lori Gunter, 787 Communications
Phone: +1-206-931-5919
Web: http://www.boeing.com




Review Article Be the first to review this article
HP

SolidCAM: Program your CNCs directly inside your existing CAD system.

Featured Video
Editorial
Jeff RoweJeff's MCAD Blogging
by Jeff Rowe
APSX Bringing Injection Molding To The Desktop
Jobs
Inside Sales for SolidCAM at Newtown, PA
Director of Mechanical Engineering for Velodyne LIDAR at Morgan Hill, CA
Sr. GIS Technical Analyst for Southern California Edison SCE Transmission and Distribution Organization at Rosemead, CA
Architect for North County Transit District at Oceanside, CA
Architetural Project Manager for DRA Architects at Irvine, CA
Upcoming Events
DriveWorks World at The Barley Store Laskey Lane Thelwall Cheshire United Kingdom - Mar 6 - 9, 2017
JEC World 2017 at Paris Nord Villepinte Exhibition Centre Paris France - Mar 14 - 16, 2017
SOLIDWORKS funding event – Leicester at The National Space Centre, Exploration Dr, Leicester, LE4 5NS Leicester United Kingdom - Mar 17, 2017
ACE 2017 Nashville at Nashville TN - Mar 21 - 23, 2017



Internet Business Systems © 2017 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy Advertise