Boeing Completes First 787 Dreamliner Engine Runs

EVERETT, Wash., May 21 /PRNewswire-FirstCall/ -- Boeing (NYSE: BA) continued to make steady progress toward the first flight of the 787 Dreamliner, completing the first engine runs on the all-new airplane. The occasion marks the first all-electric start of a commercial jetliner engine on a commercial jetliner; the engines had been started electronically in test facilities earlier.

Engine runs began at 9:30 a.m. (PDT) today and ended 40 minutes later. During initial engine runs, the engines are started and operated at various power settings to ensure all systems perform as expected. Today's engine run test began with the Auxiliary Power System providing power to start the two Rolls-Royce Trent 1000 engines.

Basic systems checks continued throughout the test. The engines were powered down and inspected and will be restarted following a technical review. The team completed a vibration check and monitored the shutdown logic to ensure it functioned as expected.

"We were very pleased with the performance on the engines during this test," said Scott Fancher, vice president and general manager of the 787 program. "We will now get ready for our intermediate and final gauntlet tests."

Contact:

Lori Gunter

787 Communication

+1 206 931 5919




Review Article Be the first to review this article
HP

ACE2017

Featured Video
Editorial
Jeff RoweJeff's MCAD Blogging
by Jeff Rowe
Major Autodesk Disruption: Carl Bass Resigns
Jobs
Inside Sales for SolidCAM at Newtown, PA
Director of Mechanical Engineering for Velodyne LIDAR at Morgan Hill, CA
Database Specialist for MDA Information Systems LLC at Gaithersburg, MD
Imagery Analyst for ARA at Albuquerque, NM -1229, NM
Architetural Project Manager for DRA Architects at Irvine, CA
Upcoming Events
DriveWorks World at The Barley Store Laskey Lane Thelwall Cheshire United Kingdom - Mar 6 - 9, 2017
JEC World 2017 at Paris Nord Villepinte Exhibition Centre Paris France - Mar 14 - 16, 2017
SOLIDWORKS funding event – Leicester at The National Space Centre, Exploration Dr, Leicester, LE4 5NS Leicester United Kingdom - Mar 17, 2017
ACE 2017 Nashville at Nashville TN - Mar 21 - 23, 2017
SolidCAM: Patented Wizard to optimal feeds & speeds



Internet Business Systems © 2017 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy Advertise