PLMIG announces the 8-Stage methodology for PLM Financial Management

Oxford, England. Jun 03, 2014 -- After publishing the PLM Financial Handbook [Lite] for project justification (see MCADCafe May 12), the PLMIG is now formalising the complete methodology for Basic and Advanced PLM Financial Management.
Basic Financial Management enables the PLM Team, with the support of the company's accountants, to establish performance metrics that can be measured and reported as PLM projects are implemented.  Advanced Financial Management integrates PLM metrics into the company's accounting structure, so that results can be seen automatically from operational to Board level.
Most user companies will begin with Basic Financial Management, and the methodology for this has 8 Stages:-
  • Positioning
  • Direction
  • Scope Check
  • Validation
  • Deconstruction
  • Calculation & Metrics
  • Roadmapping & Planning
  • Monitoring & Reporting
It might be assumed that 'Calculation & Metrics' is the most complex of these, but in fact 'Deconstruction' is the most important. The ability to break down what are often vague claims for the benefits of PLM is what enables the metrics calculation to take place.
The whole structured methodology will be reviewed at a new Workshop in Geneva on July 01-03. This will give participants a chance to see how the new material works and to input their own requirements for the finished toolset.
More information is available on the PLMIG web site, or via Email Contact.
The PLM Interest Group
The PLM Interest Group is the leading neutral industry group for PLM. It has developed the first ever PLM Governance Standard, together with a new generation of applied PLM material including the PLM Best Practice Library and the Path to PLM. Previously PLMIG workshop series have produced the PLM Benchmarking Handbook; the PLM Maturity Reference Manual; and the PLMuERP Handbook.
For more information, please contact:
Roger Tempest

Read the complete story ...

Review Article Be the first to review this article

Featured Video
Jeff RoweJeff's MCAD Blogging
by Jeff Rowe
Apple Adding To Computer Product Line Minus Ports
Currently No Featured Jobs
Upcoming Events
Electric&Hybrid Aerospace Technology Symposium 2016 at Conference Centre East. Koelnmesse (East Entrance) Messeplatz 1 Cologne Germany - Nov 9 - 10, 2016
Autodesk University Las Vegas at Las Vegas NV - Nov 15 - 17, 2016
Design & Manufacturing, Feb 7 - 9, 2017 Anaheim Convention Center, Anaheim, CA at Anaheim Convention Center Anaheim CA - Feb 7 - 9, 2017
Colortrac: LearnMore
TurboCAD pro : Start at $299

Internet Business Systems © 2016 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy Advertise