All Categories : Articles and Success Stories Bookmark and Share

Title : FDM Prototyping & Production Eliminates Tire Blowouts in Time for Next Race
Company : FORTUS 3D Production Systems
Date : 11-Mar-2010
Downloads : 4

Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

Joe Gibbs Racing Engineers determined a tire blowout was caused by an air-duct outlet not adequately cooling the tire. JGR used its Fortus 3D Production System for concept modeling, functional prototyping, and building manufacturing tools. In under 3 days, it had a new duct outlet installed on the car in time for the next race.
User Reviews More Reviews Review This File

Featured Video
Editorial
Jeff RoweJeff's MCAD Blogging
by Jeff Rowe
Siemens Goes ECAD With Mentor Graphics Acquisition
Jobs
Mechanical Engineer for IDEX Corporation at West Jordan,, UT
GIS Analyst II for Air Worldwide at Boston, MA
Senior Structural Engineer for Design Everest at San Francisco, CA
Business Partner Manager for Cityworks - Azteca Systems, LLC at Sandy, UT
Upcoming Events
Design & Manufacturing, Feb 7 - 9, 2017 Anaheim Convention Center, Anaheim, CA at Anaheim Convention Center Anaheim CA - Feb 7 - 9, 2017
Innorobo 2017 at Docks de Paris Paris France - May 16 - 18, 2017
Display Week 2017 at Los Angeles Convention Center 1201 S Figueroa St Los Angeles CA - May 21 - 26, 2017
SolidCAM: Program your CNCs directly inside your existing CAD system.



Internet Business Systems © 2016 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy Advertise