All Categories : Articles and Success Stories Bookmark and Share

Title : Giprovostokneft selects Plant-4D to design the construction of the South Khylchuyu oil field
Company : CEA Systems
Date : 18-Feb-2012

Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

The South Khylchuyu oil field is located in the Nenets Autonomous district in the Arkhangelsk region, 120 km north-east of Naryan-Mar - the administrative center of the Nenets district and 80 km north-west of p.Haryaginsky. Plant-4D was used in designing the construction of wells of a central gathering station. More specifically, the facilities that transport oil and purify water. There are two production lines, each with an output of 3.8 million tons of oil per year.
User Reviews More Reviews Review This File


Featured Video
Jobs
Mgr Mechanical Engineering 2 for Northrop Grumman at Melbourne, FL
Senior Design Engineer for Kaman at Gilbert, AZ
MECHANICAL ENGINEER for Peter R. Thom and Associates at ORINDA, CA
Sr. Mechanical Engineer for Kateeva at Newark, CA
Upcoming Events
Solidworks World 2017 at Los Angeles CA - Feb 5 - 8, 2017
Design & Manufacturing at Anaheim Convention Center Anaheim CA - Feb 7 - 9, 2017
ACE 2017 Nashville at Nashville TN - Mar 21 - 23, 2017
Innorobo 2017 at Docks de Paris Paris France - May 16 - 18, 2017
MasterCAM



Internet Business Systems © 2017 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation GISCafe - Geographical Information Services TechJobsCafe - Technical Jobs and Resumes ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy Advertise